044 - 2235 7633 / 7634 / 7635 / 7636

ANNA UNIVERSITY, CHENNAI

Tubidy Tubidy Tubidy Tubidy Tubidy Tubidy Tubidy bursalagu download lagu download lagu download lagu download lagu download lagu download lagu download lagu download lagu metrolagutubidy tubidy tubidy tubidy tubidy tubidy tubidy tubidy tubidy tubidy tubidy tubidy tubidy

Dr. K. Gunasekaran, Ph.D

Professor & Head of the Division (DnTE) & Director (Planning & Development)

Dr. K. Gunasekaran, Ph.D

Professor & Head of the Division (DnTE) & Director (Planning & Development)
kgunasekaran@annauniv.edu

Sponsored Research Activities:

Traffic Impact study for Chennai One IT Park - Phase II building Duration: N/A Role: N/A Agency: funded by IG3 Infra Ltd

Study on Passenger Travel Characteristics and Identification of Measures for Improvement of Patronage of TNSTC(Villupuram) Buses Duration: 1 Year Role: N/A Agency: funded by TNSTC Villupuram Ltd

Study on Bus Priority Lane Duration: 6 Years Role: N/A Agency: funded by UGC

Decision Support System for Safety Evaluation of Urban Intersections Duration: 4 Years Role: N/A Agency: funded by AICTE

Development of Indian Highway Capacity manual (Indo HCM) Duration: 1 Year Role: N/A Agency: funded by CSIR-CRRI New DElhi

Design of Intersection at Entry to Rajparis property at Pallavaram Duration: N/A Role: N/A Agency: funded by Raj Paris Constructions Pvt Ltd

Methodology to Devise Traffic management Measure during the construction of Metrorail station in the Airport premises Duration: N/A Role: N/A Agency: funded by URC Constructions Pvt Ltd

Study on Commuters Travel Characteristics along Chennai Metro Rail Corridors Duration: N/A Role: N/A Agency: funded by M/s CMRL Chennai

Improving Transit System Performance through Automatic Data Collection Systems Duration: 2 Years Role: N/A Agency: funded by CoEUT IITM

Study on Safety at Work Zones in Urban Areas Duration: 2 Years Role: N/A Agency: funded by CoEUT IITM

Traffic study for Metro Rail Section ECV 07 (OTA to Airport) Duration: 1 Years Role: N/A Agency: funded by M/s Lanco

Parking Study for sathangadu Iron and Steel Market Duration: N/A Role: N/A Agency: funded by Chennai Metropolitan Development Authority

Planning of Grade Separators along Anna Salai Duration: N/A Role: N/A Agency: funded by Highways Department

Operation of mini Buses in Chennai City and Suburban Areas Duration: N/A Role: N/A Agency: funded by Metropolitan Transport Corp[oration Ltd

Study on Traffic Impact due to Proposed state Modern Library at Kotturpuram Duration: N/A Role: N/A Agency: funded by M/s C R Narayana Rao

Study on Traffic Impact due to the Proposed Assembly and Secretariat Complex to Government Estate Duration: N/A Role: N/A Agency: funded by M/s Archivista and PWD, Chennai

Development Plan for Least Urbanised Taluks Duration: N/A Role: N/A Agency: funded by M/s DTCP

Traffic Study for Development of Road Infrastructure and De-congestion Planning for All the Gates in Tuticorin Port Duration: 50 Years Role: N/A Agency: funded by M/s RITES

Customer Satisfaction of Vehicle Tracking Control System Duration: N/A Role: N/A Agency: funded by M/s IIITB,Bangalore

Planning of Grade Separator at Chamiers Road Intersection Duration: N/A Role: N/A Agency: funded by Chennai Corporation

Traffic study near Toll plazas on National Highways Duration: N/A Role: N/A Agency: funded by NHAI

Comprehensive Traffic and Transportation Study for Port Blair Duration: N/A Role: N/A Agency: funded by Andaman PWD

Proof checking of Grade Separator at North Usman Road Duration: N/A Role: N/A Agency: funded by M/s Gammon India

Planning and Design of Grade Separator at Perambur Duration: N/A Role: N/A Agency: funded by Chennai Corporation

Planning and Design of Terminals and Depots for MTC, Chennai Duration: N/A Role: N/A Agency: funded by Tamilnadu Urban Infrastructure Financial Services Ltd

Pre-Feasibility Study on the Proposed Road Alignment along Water Courses of Chennai Duration: N/A Role: N/A Agency: funded by Tamilnadu Urban Infrastructure Financial Services Ltd

Study on Improving the accessibility and circulation to IT Corridor Duration: N/A Role: N/A Agency: funded by Chennai Metropolitan Development Authority

Design of Extended bus stand at Poonamallee Duration: N/A Role: N/A Agency: funded by Commiosionarate of Municipal Administration

Traffic study for Proposed Shopping Mall at Adyar Duration: N/A Role: N/A Agency: funded by M/s True value Homes

Traffic Study for Proposed Shipyard at Silambimangalam Duration: N/A Role: N/A Agency: funded by M/s.Goodearth Ltd, Chennai

"DPR for purchase of Buses for MTC, TNSTC(M) and TNSTC (C) Duration: N/A Role: N/A Agency: funded by Tamilnadu Urban Infrastructure Financial Services Ltd

"DPR II for purchase of Buses for MTC, TNSTC(M) and TNSTC (C) Duration: N/A Role: N/A Agency: funded by Tamilnadu Urban Infrastructure Financial Services Ltd

Study on Traffic Impact due to the Proposed Medical College at Villupuram Duration: N/A Role: N/A Agency: funded by M/s PWD, Chennai

Tubidy Tubidy Tubidy Tubidy Tubidy Tubidy Tubidy bursalagu download lagu download lagu download lagu download lagu download lagu download lagu download lagu download lagu metrolagutubidy tubidy tubidy tubidy tubidy tubidy tubidy tubidy tubidy tubidy tubidy tubidy tubidy