044 - 2235 7513
Traffic Impact study for Chennai One IT Park - Phase II building
Duration: N/A
Role: N/A
Agency: funded by IG3 Infra Ltd
Study on Passenger Travel Characteristics and Identification of Measures for Improvement of
Patronage of TNSTC(Villupuram) Buses
Duration: 1 Year
Role: N/A
Agency: funded by TNSTC Villupuram Ltd
Study on Bus Priority Lane
Duration: 6 Years
Role: N/A
Agency: funded by UGC
Decision Support System for Safety Evaluation of Urban Intersections
Duration: 4 Years
Role: N/A
Agency: funded by AICTE
Development of Indian Highway Capacity manual (Indo HCM)
Duration: 1 Year
Role: N/A
Agency: funded by CSIR-CRRI New
DElhi
Design of Intersection at Entry to Rajparis property at Pallavaram
Duration: N/A
Role: N/A
Agency: funded by Raj Paris
Constructions Pvt Ltd
Methodology to Devise Traffic management Measure during the construction of Metrorail
station in the Airport premises
Duration: N/A
Role: N/A
Agency: funded by URC Constructions Pvt Ltd
Study on Commuters Travel Characteristics along Chennai Metro Rail Corridors
Duration: N/A
Role: N/A
Agency: funded by
M/s CMRL Chennai
Improving Transit System Performance through Automatic Data Collection Systems
Duration: 2 Years
Role: N/A
Agency: funded
by CoEUT IITM
Study on Safety at Work Zones in Urban Areas
Duration: 2 Years
Role: N/A
Agency: funded
by CoEUT IITM
Traffic study for Metro Rail Section ECV 07 (OTA to Airport)
Duration: 1 Years
Role: N/A
Agency: funded by M/s Lanco
Parking Study for sathangadu Iron and Steel Market
Duration: N/A
Role: N/A
Agency: funded by Chennai Metropolitan
Development Authority
Planning of Grade Separators along Anna Salai
Duration: N/A
Role: N/A
Agency: funded by Highways Department
Operation of mini Buses in Chennai City and Suburban Areas
Duration: N/A
Role: N/A
Agency: funded by Metropolitan
Transport Corp[oration Ltd
Study on Traffic Impact due to Proposed state Modern Library at Kotturpuram
Duration: N/A
Role: N/A
Agency: funded by M/s
C R Narayana Rao
Study on Traffic Impact due to the Proposed Assembly and Secretariat Complex to
Government Estate
Duration: N/A
Role: N/A
Agency: funded by M/s Archivista and PWD, Chennai
Development Plan for Least Urbanised Taluks
Duration: N/A
Role: N/A
Agency: funded by M/s DTCP
Traffic Study for Development of Road Infrastructure and De-congestion Planning for All the
Gates in Tuticorin Port
Duration: 50 Years
Role: N/A
Agency: funded by M/s RITES
Customer Satisfaction of Vehicle Tracking Control System
Duration: N/A
Role: N/A
Agency: funded by M/s IIITB,Bangalore
Planning of Grade Separator at Chamiers Road Intersection
Duration: N/A
Role: N/A
Agency: funded by Chennai Corporation
Traffic study near Toll plazas on National Highways
Duration: N/A
Role: N/A
Agency: funded by NHAI
Comprehensive Traffic and Transportation Study for Port Blair
Duration: N/A
Role: N/A
Agency: funded by Andaman PWD
Proof checking of Grade Separator at North Usman Road
Duration: N/A
Role: N/A
Agency: funded by M/s Gammon India
Planning and Design of Grade Separator at Perambur
Duration: N/A
Role: N/A
Agency: funded by Chennai Corporation
Planning and Design of Terminals and Depots for MTC, Chennai
Duration: N/A
Role: N/A
Agency: funded by Tamilnadu Urban
Infrastructure Financial Services Ltd
Pre-Feasibility Study on the Proposed Road Alignment along Water Courses of Chennai
Duration: N/A
Role: N/A
Agency: funded by Tamilnadu Urban Infrastructure Financial Services Ltd
Study on Improving the accessibility and circulation to IT Corridor
Duration: N/A
Role: N/A
Agency: funded by Chennai
Metropolitan Development Authority
Design of Extended bus stand at Poonamallee
Duration: N/A
Role: N/A
Agency: funded by Commiosionarate of Municipal
Administration
Traffic study for Proposed Shopping Mall at Adyar
Duration: N/A
Role: N/A
Agency: funded by M/s True value Homes
Traffic Study for Proposed Shipyard at Silambimangalam
Duration: N/A
Role: N/A
Agency: funded by M/s.Goodearth Ltd,
Chennai
"DPR for purchase of Buses for MTC, TNSTC(M) and TNSTC (C)
Duration: N/A
Role: N/A
Agency: funded by Tamilnadu
Urban Infrastructure Financial Services Ltd
"DPR II for purchase of Buses for MTC, TNSTC(M) and TNSTC (C)
Duration: N/A
Role: N/A
Agency: funded by Tamilnadu
Urban Infrastructure Financial Services Ltd
Study on Traffic Impact due to the Proposed Medical College at Villupuram
Duration: N/A
Role: N/A
Agency: funded by M/s
PWD, Chennai